The Finishing Touch has been busy moving to new premises at Factory 6, 143 Canterbury Road in Kilsyth. With the move they now have a new telephone number. This change represents an upgrade to a more modern factory with better facilities and larger space for storage, which will be particularly helpful for Finishing Touch’s installer Precise Profiles.
A large project recently undertaken to manufacture and install lightweight mouldings was for a substantial block of apartments at 336 Glenferrie Road, Malvern being built by Krongold Constructions. This apartment complex is a post-modern, three storey high building with a fifty six squares top floor, thirty squares second floor, fifty six squares ground floor and a basement of forty squares, totalling one hundred and eighty two squares. The mouldings supplied were:
Stepped band mould on the second floor at 300mm x 90mm
Pilaster capital on the second floor, 180mm high
Parapet for balustrade capping on the terrace of the first floor and parapets for the first floor, 80mm x 280mm
Window headers for first floor windows 110mm x60mm and ground floor windows 185mm x 35mm
Moulding insert for the main entry frieze 375mm x 375mm
Parapet capping for the pool building 570mm x 90mm
Parpapet capping for balustrade in courtyard area, retaining wall along driveway and ground floor balustrade 80mm x 200-380mm (to suit blockwork).
Being in Sydney a job for the Bonavista Hotel at 76 Middle Head Road, Mosman was for supply only of fifty four lengths of three metre stringers (model # S5) measuring 120mm x 35mm, thirty metres of wall capping (model # WC2) measuring 358mm x 110mm, six parapet mouldings (model # S19) 120mm x 89mm and one Arch with a radius 1200mm (model # S19).
Another property in Wandana Heights, Victoria required the supply only of thirty lengths parapet (M258B) 258mm x 190mm x 2400mm length and thirty lengths stringer (DGC093) 95mm x 71mm x 2400mm length.